Gamma Ray (API)
Vertical Section — Trajectory Plot
| MD | Inc° | Azi° | TVD | DLS |
|---|
Toolface (read-only)
Steering Controls
NEUTRAL
Arrow keys or hold buttons
Survey Data
| MD | Inc° | Azi° | TVD | DLS |
|---|
Rig Parameters
WOB (klbs)
ROP0 ft/hr
MD6300 ft
Inc15.0°
TVD0 ft
In ZoneNO
Score0.0%
Formation—
Controls
ON BOTTOM — Ready
HOW TO DRILL:
1. Click START to begin drilling
2. Steer with arrow keys or buttons:
• ▲ BUILD = curve toward horizontal
• ▼ DROP = curve back toward vertical
• ◀▶ = turn left/right
• Release = drill straight
3. Watch the gamma ray — low (green) = pay zone
4. Land in the Wolfcamp A and keep the bit in zone
5. Adjust WOB — higher = faster but more drift
Goal: maximize in-zone % over the 2-mile lateral
1. Click START to begin drilling
2. Steer with arrow keys or buttons:
• ▲ BUILD = curve toward horizontal
• ▼ DROP = curve back toward vertical
• ◀▶ = turn left/right
• Release = drill straight
3. Watch the gamma ray — low (green) = pay zone
4. Land in the Wolfcamp A and keep the bit in zone
5. Adjust WOB — higher = faster but more drift
Goal: maximize in-zone % over the 2-mile lateral